Building Recertification Repairs in Miami-Dade County
Received a recertification notice or an engineer’s report? Academia helps define the repair scope, coordinate permits and carry out the construction work. The required professional inspection and sealed report remain with the appropriately licensed design professional.
Have a notice or an inspection report? Here is the next step.
The inspection and sealed report belong to the appropriately licensed design professional. Academia coordinates the construction scope: turning the findings into defined work, permits, execution and closeout documentation.
- Share the notice, available reports and the locations of the reported deficiencies.
- Identify quantities, access, occupant protection and restoration of disturbed surfaces.
- Separate professional fees, authority charges and the construction price.
- Define responsibility for permits, testing, reinspection and closeout records.
See a roof, wood and concrete restoration record as an example of construction execution; it is not a recertification inspection report.
Budget guide: inspection, authority fees and repairs · Request a repair-scope assessment
Official Miami-Dade guidance. Confirm the requirements and deadlines with the authority for your property.
The county’s oldest recertification program.
Miami-Dade County requires a building recertification at 30 years of age, and every 10 years thereafter (40-year, 50-year, and so on) — shortened from 40 years by county ordinance adopted June 1, 2022 (Miami-Dade County Code §8-11(f)). Buildings already running on the original pre-1983 40-year schedule continue on that schedule, and condominium or cooperative buildings three stories or taller located within three miles of the coastline and built in 1998 or later are first inspected at 25 years. The program is administered by your municipal building official and the Miami-Dade Board of Rules and Appeals (BORA).
A Florida-licensed engineer or architect inspects the building’s structural and electrical systems and files a recertification report. Where that report identifies deficiencies, repairs must be permitted and completed to keep the building certified. Since SB-4D, the statewide Milestone Inspection (at 30 years — or 25 where the local enforcement agency requires it) now overlays the county’s recertification program — many Miami-Dade buildings are managing both at once.
The inspection is the easy part. Execution isn’t.
Report to scope
We convert the recertification report’s narrative findings into a quantified, permittable scope — structural repairs, electrical corrections, spalling and rebar remediation, and waterproofing — with realistic Miami-Dade unit costs.
Through the building department
We pull and manage the repair permits with your municipal building official, coordinate the engineer of record, and keep the recertification clock from running out.
Self-performed, in-house
General contracting, roofing, plumbing, HVAC, electrical, and solar are held in-house — so the structural and electrical corrections the report demands are completed under one accountable operator, on occupied buildings.
Recertification across Miami-Dade.
We work recertification and restoration scopes throughout Miami-Dade’s coastal and urban core — the buildings facing the most aggressive structural aging and insurance pressure.
Miami · Miami Beach · Coral Gables · Aventura · Sunny Isles Beach · Bal Harbour · Surfside · North Miami Beach · North Miami · Key Biscayne · Hialeah · Doral · Coral Way · Brickell · Downtown Miami · Kendall · Homestead · Cutler Bay
Miami-Dade recertification, answered.
When does my Miami-Dade building need to be recertified?
Miami-Dade requires recertification when the building reaches 30 years of age, then every 10 years after (40-year, 50-year, etc.). The 30-year trigger replaced the former 40-year trigger by county ordinance adopted June 1, 2022; buildings already on the original pre-1983 40-year schedule stay on that schedule. The building official issues a notice, and the owner has a defined window to file a recertification report prepared by a Florida-licensed engineer or architect. Buildings may also owe an SB-4D Milestone Inspection — at 30 years, or 25 years where the local enforcement agency requires it.
Who performs the inspection versus the repairs?
A Florida-licensed engineer or architect performs the recertification inspection and files the report — that is their role, and it must stay independent. Academia is the contractor: we take the completed report and execute the structural, electrical, and envelope repairs it calls for, permitted through your municipal building department. We coordinate directly with the engineer of record so what gets built matches what the report requires.
What is the difference between the 40-year recertification and the SB-4D Milestone Inspection?
The county recertification, long called the 40-year recertification, now first falls due at 30 years of age and is tied to the building’s age. The Milestone Inspection is a newer statewide requirement created by SB-4D for condominium and cooperative buildings three stories or taller, triggered at 30 years — or 25 years where the local enforcement agency requires it. Many Miami-Dade condominiums now fall under both, plus a Structural Integrity Reserve Study (SIRS). We manage the repair scope across all of them as one coordinated capital program.
What happens if we miss the recertification deadline?
Failure to recertify on time can lead to code-enforcement action, fines, and — in cases of identified unsafe structural conditions — a determination that the building is unsafe for occupancy. The practical risk is compounding: delayed repairs get more expensive, and insurance carriers and lenders increasingly require proof of recertification compliance. The fastest way out is a contractor who can scope, permit, and execute without a second round of delay.
How quickly can the repairs be completed?
It depends on the scope in the report, but the bottleneck is rarely the construction — it’s scoping, permitting, and coordination. Because we self-perform across trades and manage the permit and engineer coordination in-house, we compress the gap between “report received” and “repairs underway.” Send us the recertification report and we’ll give you a realistic Miami-Dade timeline and budget within one business day.
Have a Miami-Dade recertification report in hand?
Send us the report or the county notice. We’ll translate it into a permitted scope, schedule, and budget — and respond within one business day.
Request a Recertification AssessmentVisible conditions start the scope.
The June 24, 2025 Trinity Church existing-condition survey documents the building context and visible window and facade details. It is a visible-condition record, not an engineering inspection or certification. No repair scope or completion status is inferred from these two survey photographs; the third frame comes separately from Academia's completed-project repair archive.
- Miami
- Survey · June 24, 2025
- Visible record · not certification



Real images · No generated scenes · Attribution limits stated above.